| Project Size |
206 Megawatts |
| Number of turbines |
111 turbines |
| Turbine type |
1.856 MW |
| Expected date for commercial operation |
April 2012 |
| Annual production |
111 turbines will produce enough electricity to power up to 144,455 homes
|
| Tonnes of CO2 emissions saved |
Up to 700,000 tonnes per annum – equivalent to taking up to 271,260 cars off the road every year for the life of the wind farm |
| Expected operating life |
25 years
|
| Contractor |
Vestas Wind Systems & Downer Engineering |